|
david
|
 |
« on: May 04, 2008, 02:58:34 AM » |
|
A: Yes it does areas such as driveways need to be top-up sealed every 12 months, however areas like patios and general foot traffic areas can be topped up every 18 months. In saying that decorative concrete such as faux-brick, exposses aggregate, slate finish even colour concrete needs to be resealed at the same intervals.
If you dont reseal decorative concrete or spray pave the colour will start to fade over time and stains will stsrt to penetrate.
|